Facility Operations & Condition Assessments

JGMS uses methodologies that are designed to produce accurate, consistent, and impartial assessment results. Our Facility Condition Assessment (FCA) services are based upon widely recognized industry standards, and unparalleled experience gained from assessing thousands of facilities throughout the United States. Our FCA’s help determine immediate and long-term liabilities for deferred maintenance, building component life cycle renewal, code compliance, and functional inadequacies. The FCAs enable capital project planning to address current operational requirements, full capital funding scenario planning, and facility renewal forecasting. These processes assist our clients in complying with regulatory accounting and reporting requirements.

Facility Operations & Condition Assessments Capabilities

  • Facility Condition Assessments (FCA)
  • Maintenance Management Systems
  • Structures Maintenance
  • Energy Management Systems
  • Environmental Monitoring
  • Environmental Management
  • Security Services
  • Electrical Equipment O&M
  • HVAC/R Equipment O&M
  • Information Technology Services
  • HazardousWaste Management
  • Preventive Maintenance
paragraph separator

Invaluable Experience

National Renewable Energy Labs (NREL), Golden Field Office   U.S. Department of Housing & Urban Development (HUD)

JGMS provides facility condition assessments services, energy consumption analysis, real property management utilizing the FIMS database web application, and technical support to NREL. Over 58 facilities and 51 independent other structures and facilities (OSF) totaling 1.5 million gross square feet were assessed at two independent scientific and research development sites, and one leased site.

 

JGMS conducted facility condition assessments and energy audits for HUD consisting of 1,450 public housing and senior dwelling units located in Lackawanna, County Pennsylvania and Middletown, Connecticut. JGMS validated a new Physical Needs Assessment (PNA) tool which will be used to capture both short and long-term capital improvement needs as well as energy conservation measures and initiatives.

paragraph separator